Kedron State High School, Performing Arts Centre | AV Integration Case Study

A Flexible Performing Arts Centre Where Learning Meets Performance 

Kedron State High School’s new Performing Arts Centre is a purpose-built venue designed to support a diverse range of activities, from performances and events to teaching, rehearsals and collaborative learning.

The school needed a professional-grade AV solution that could deliver exceptional audio, video and control while remaining simple enough for staff to operate every day. Equally important was ensuring students had access to the same professional equipment and workflows used across the performing arts industry.

Videopro was engaged as the AV integrator to bring the consultant-designed solution to life, working closely with Kane Constructions and ITE to deliver the project.

A Complete AV Solution for a Multi-Purpose Venue

The Performing Arts Centre was designed as a highly flexible environment, with the main hall capable of being divided into multiple areas to support different teaching and learning activities.

Key project requirements included:

  • Delivering professional-grade audio and video for performances and events.
  • Providing intuitive control for staff across multiple areas of the venue.
  • Supporting teaching and learning alongside performance activities.
  • Providing students with access to industry-standard technology.
  • Distributing performance audio and video throughout the building.
  • Integrating AV with the venue’s stage machinery, lighting and operational systems.

The result is a flexible environment that can adapt to the needs of the school throughout the day.

AV Up

A Comprehensive Integrated AV Solution

Videopro delivered the AV integration across the Performing Arts Centre, uniting the venue’s audio, video and control systems into a cohesive environment.

Flexible Spaces for Teaching and Performance

The Performing Arts Centre can be divided into five sections – the foyer, the stage and three separate learning areas within the main hall.

Each space features dedicated touch panel control, giving staff the ability to manage the technology independently and configure the environment to suit different activities.

This flexibility allows the centre to transition between teaching, rehearsal, performance and event modes.

AV Solution in a Performing Arts Centre Foyer
Flexible learning spaces in a Performing Arts Centre

Professional Audio and Video

The centre features five Epson projectors, providing visual coverage across the venue. Two projectors are positioned at the front of the space on either side of the stage, another projects onto a large motorised screen in the middle of the main hall, a fourth projects onto the large cyclorama wall on the stage and the fifth projector is positioned at the back of the main hall and projects onto the operable wall.

With Q-SYS DSP supporting audio processing and distribution, a professional audio system using dB Technologies was installed to provide audio reinforcement throughout the main hall. In addition to the main hall audio system, JBL audio was used throughout the facility to provide coverage in the surrounding areas.

The intuitive Crestron control system enables seamless operation across all areas of the facility, with a user-friendly interface that makes it simple for staff and students to use.

AV Solution in a Performing Arts Centre

Performance Relay Throughout the Building

The AV solution extends beyond the main performance space.

Audio and video relay systems distribute performance content to the dressing rooms, back-of-house classrooms and other areas throughout the facility enabling the venue to be used for large performances. A dedicated speaker system also provides audio from performances or the control room across the building.

This ensures students, staff and performers can stay connected to what is happening on stage, regardless of where they are within the facility.

Camera relay in a school performing arts centre.

Motorised Lighting Bars

Eight lighting bars were installed, including five motorised bars that can be lowered to ground level for easier access when installing fixtures.

Motroised lighting bars in a school performing arts centre.

Designed for Easy, Everyday Operation

A key focus for the project was making professional AV technology accessible to school staff and students. While the centre incorporates sophisticated audio, video and control systems, each space can be operated through intuitive, easy-to-use wall-mounted touch panels.

The result is a venue that combines professional capability with everyday usability, giving the school the flexibility to use the space across a wide range of activities.

Audio visual systems in a performing arts centre control room.

Bringing the Design to Life

The AV solution was designed by an external consultant, with Videopro responsible for integrating and delivering the technology in line with the overall design vision.

The project involved extensive coordination between the construction, stage machinery, AV and installation teams.

Approximately 16 kilometres of cable were installed throughout the building, with 70 AV connection points distributed across the venue and back-of-house areas providing flexible performance connectivity to the system.

Videopro Proud

From a consultant’s drawings to a completed performing arts centre, we are incredibly proud of our team and what they have built.

This professional, flexible and future-ready venue gives Kedron State High School the capability to support performances, teaching, learning and events for years to come.

For Videopro’s project team, seeing the systems come online for the first time was the culmination of months of planning, coordination and installation.

The finished venue gives staff intuitive control, provides students with access to professional-grade technology and creates a space that can adapt to the changing needs of the school.

“It’s quite an incredible space that is going to serve this school well into the future,” said Patrick Byrne, Videopro Account Manager.

A Professional AV Partner for Education

From learning environments to specialist performing arts facilities, Videopro delivers integrated AV solutions designed around the way educational spaces are used. Our team works alongside consultants, builders and project stakeholders to deliver reliable, intuitive technology from design through to commissioning.

For more information or to speak to our expert team about an audio visual solution for your workplace or educational space, contact us on 07 3250 0000 or via our website contact form.

St Joseph’s College, Margaret Rice Place | Audio Visual Case Study

Revitalising a 1970s Building into a Modern Purpose-Built Learning Space

St Joseph’s College has reimagined a 1970s-era hostel into a contemporary, vertically integrated learning environment for Year 5 and 6 students. The newly renovated Margaret Rice Place brings together teaching, creative arts and student amenities into a single, self-contained facility designed to support modern educational needs.

While the original building shell was retained, the internal transformation is extensive. The space now accommodates general learning areas (GLAs), specialist teaching zones, breakout spaces, a resource centre and dedicated facilities including art, science and a tuckshop, ensuring students have everything they need within one cohesive environment.

Videopro named finalist in 2026 AVIA Awards
Videopro named finalist in Inavate APAC Awards 2026

A Complete Audio Visual Transformation

The project required a complete AV transformation to match the building’s ambitious redesign. Key challenges included:

  • Retrofitting modern AV technology within an existing structure.
  • Delivering consistent, easy-to-use systems across diverse learning spaces.
  • Supporting specialised environments such as music, drama and collaborative learning areas.
  • Meeting tight project timelines within a fast-moving construction program.

Following the successful delivery of a large-scale PA system at the College’s Tennyson playing fields, Videopro was engaged to deliver the AV solution for Margaret Rice Place.

Margaret Rice Place

A Comprehensive Integrated AV Solution

Videopro delivered a comprehensive, integrated AV solution tailored to each learning environment, while maintaining a consistent user experience across the building.

Flexible Learning Spaces (GLAs)

  • Standardised CommBox interactive flat panels across all general learning areas.
  • Systems installed both wall-mounted and on mobile trolleys for flexibility.
  • Integrated Phonak hearing augmentation and voice uplift to improve accessibility.
  • Custom-designed enclosures for assistive technology, enhancing both functionality and aesthetics.
Flexible Learning Space
Flexible Learning Space

Specialist Music & Drama Facilities

The upper levels house a range of high-performance creative spaces, including:

  • Individual rehearsal studios equipped with KRK studio monitor speakers and mixing desks.
  • A large band rehearsal room featuring KV2 professional-grade audio systems and Allen & Heath mixing desks.
  • A dedicated music lab with iMac computer workstations, keyboards and audio production tools. This room also has the capability for the teacher to route students’ audio to the room’s speaker system, supporting collaborative and performance-based learning.
Large band room with professional-grade audio systems
Music room with mixing desks and audio production tools

Collaboration & Meeting Spaces

  • A fully equipped boardroom featuring a Crestron Flex Microsoft Teams Room system.
  • BYOM (Bring Your Own Meeting) capability for flexible collaboration.
  • Crestron ceiling speakers, Shure ceiling-mounted microphones and AVer PTZ camera for seamless hybrid meetings.
Meeting Space
Crestron Flex
Ceiling mounted speakers and microphones

Outdoor Assembly Space

  • Tiered seating outdoor assembly area designed for large gatherings.
  • Pixon Technology LED display for presentations and events.
  • QSC integrated audio system for clear, even coverage.
  • Centralised Crestron control system enabling simple operation for staff.
Pixon Technology LED Screen in an outdoor assembly space

Ease of Use by Design

A key priority was ensuring technology enhanced teaching, not complicated it. All the technology and systems that have been used in this project, from intuitive Crestron Control systems to the standardised CommBox interactive flat panels, allow the staff to:

  • Plug in their device and begin instantly.
  • Control displays and AV systems with a single touch.
  • Operate complex environments without technical expertise.

This simplicity has resulted in strong user adoption and a seamless experience.

Videopro Proud

Despite a highly dynamic and fast-paced build, Videopro successfully delivered a fully operational AV solution on time for the start of term.

The result is a future-ready learning environment that:

  • Supports diverse teaching and learning styles
  • Enhances accessibility and inclusivity
  • Enables high-quality creative and performing arts education
  • Delivers reliable, easy-to-use technology across every space

“Videopro were fantastic. Everything was supplied, it was up and running on the day we needed it to, and it all worked.” Nick Jeffery, Property & Facilities Manager, St Joseph’s College Gregory Terrace.

Let’s Chat

For more information or to speak to our expert team about an Audio Visual solution for your workplace or educational space, contact us on 07 3250 0000 or via the website.

John Paul College Coleman Centre | Audio Visual Case Study

Optimising AV Performance for a Multi-Purpose Hall

The Coleman Centre at John Paul College in Daisy Hill is the school’s main multi-purpose hall, hosting everything from assemblies and musicals to basketball and volleyball. With such diverse uses, the space required a flexible, high-performance audio visual solution that could meet both presentation and sporting needs.

The school’s existing over-stage rear-projection system had limited sight lines, making images difficult to see from many areas of the hall. Audio performance also fell short, and the school sought a more engaging, impactful experience for both students and the wider community.

Videopro was engaged to transform the hall’s AV setup. Partnering with CommBox, whose technology is already used across classrooms at John Paul College, Videopro designed and installed a new three-screen display system supported by an upgraded audio network. Every element was carefully selected to withstand the demands of a sports environment, ensuring durability and safety while delivering crisp visuals, clear audio and a seamless experience for every event.

A Three-Screen Display Solution

To address visibility challenges, a new three-screen configuration was introduced. This setup allows the school to display different content across the screens, for example, a live feed or presentation on the over-stage projection screen, while supporting visuals appear on the two large LED side screens.

Two 220-inch, 2.5-pixel pitch LED displays from CommBox were installed, delivering exceptional brightness and wide viewing angles. The enhanced brightness ensures content remains vivid and clear, even with high levels of ambient light or when the house lights are fully raised.

The school’s familiarity with CommBox technology inside their classrooms, made this a natural partnership, and stakeholders from the school were able to visit the CommBox Experience Centre in Spring Hill to view the technology that they would be using in the hall.

John Paul College Coleman Centre AV Upgrade

Engineering for Safety and Durability

Given the scale and weight of the LED displays (each exceeding 300 kilograms), structural integrity was of key importance. The school engaged a structural engineer to design and certify appropriate wall supports. Close collaboration ensured all mounting systems were rated and compliant for safe installation.

To withstand the rigours of a sports environment, the LED panels include:

  • A protective polymer layer over the cabinet face to guard against ball strikes
  • Stainless steel safety tethers securing each tile to the frame, preventing panels from falling in the unlikely event of dislodgement

These design features deliver long-term durability while ensuring the highest safety standards for students and staff.

Videopro AV Technicians installing a LED screen into a school multipurpose hall
LED Screen installed in multipurpose hall

Enhanced Projection Capability

Complementing the two LED screens is a new over-stage projection system featuring a 13,000-lumen laser projector from Epson, projecting onto a 200-inch motorised screen. The high brightness output ensures strong image performance, even in challenging lighting conditions.

Motorised projector screen and projector
Motorised screen over a stage
Projector

A Comprehensive Audio Upgrade

To match the visual improvements, the Coleman Centre also received a complete audio enhancement, including:

  • Front-of-house speakers and delay speakers from QSC for even sound coverage
  • Subwoofers positioned beneath the stage for low-frequency reinforcement
  • Shure ULXD wireless microphones for reliable, high-quality vocal capture
  • An Allen & Heath QU digital mixer for intuitive control and flexible event management

The result is balanced sound throughout the hall, supporting everything from presentations and assemblies to full musical productions.

LED Screen and sound system

Videopro Proud

From the moment the new screens were powered on, the impact was immediate. Staff and stakeholders were impressed by the clarity, brightness and visual presence of the displays. Feedback from both the school community and visiting parents has been overwhelmingly positive, particularly regarding improved visibility from all areas of the hall.

This upgrade ensures the space continues to support the diverse needs of John Paul College.

“When the screens were first turned on, I think everyone was impressed with the image quality and the overall brightness, especially with all the ambient light that is in the space. And even with the house lights turned up full, the image cuts through all of that light. ” said Mark Chaplin, Videopro Account Manager.

Finalist in the 2025 Inavate APAC Awards ‘Education’ Category

This John Paul College project was recognised by the industry at the 2025 Inavate APAC Awards where Videopro was named as a finalist in the ‘Education’ category.

Let’s Chat

For more information or to speak to our expert team about an Audio Visual solution for your workplace or educational space, contact us on 1300 843 367 or via the website.

Brisbane Grammar School STEAM Building | Audio Visual Case Study

Setting a New Benchmark for Future-Focused Learning

In 2024, Brisbane Grammar School (BGS) opened its purpose-built STEAM Building. This exciting new building was designed to be a hub for ideas and innovation, and we are thrilled with the end result. The STEAM precinct is a five-level flagship facility which includes science labs, classrooms, combinable design studios, breakout zones, meeting spaces and a large, flexible format incubator space – all designed to support contemporary teaching and learning across Science, Technology, Engineering, Arts and Mathematics.

Working in partnership with BESIX Watpac, Videopro is proud to have delivered an intuitive Audio Visual ecosystem of innovative technologies and system solutions that supports flexible, student-centred learning while remaining simple for teachers to use every day. The result is a technology-rich environment where AV enhances learning without becoming a distraction.

Supporting a Contemporary Teaching Vision

From the outset, the project was guided by a clear educational objective: to create spaces where technology fades into the background, allowing teachers to focus their attention on teaching.

Working closely with BGS Digital Innovation Specialist, Mitchell Collins, the design prioritised learning from the centre of the room, with teachers and students working side by side rather than from a traditional front-of-class position. Wireless presentation, flexible display layouts and consistent room control enable teachers to move freely, adapt content in real time and support both whole-class and small-group learning.

“We wanted to create sort of the seamless transition between teaching and innovation so that we could have the technology almost like fade into the background so that the teachers could use the screens without even having to think about it.” said Mitchell Collins, Brisbane Grammar School.

Brisbane Grammar School - AV Integrated Solution by Videopro

A Unified AV Backbone Across Diverse Spaces

While each space within the STEAM Building has unique functional requirements, Videopro delivered a unified AV backbone that provides a consistent user experience across the entire facility.

As a long-standing “Crestron house”, Brisbane Grammar School benefits from a familiar control environment in every room. Teachers can walk into any space and operate the technology with confidence.

Key elements of the AV solution include:

  • LG commercial displays deployed across classrooms and shared spaces
  • Crestron NVX encoders and decoders at all displays and touchdown points
  • Shure lapel microphones in every classroom to ensure clear audio delivery
  • Crestron ceiling speakers throughout the building
  • Building-wide digital signage for communication and wayfinding

This consistent approach simplifies support, improves reliability and ensures long-term scalability.

Brisbane Grammar School - AV Integrated Solution by Videopro
Brisbane Grammar School STEAM Building - AV Design and Installation by Videopro

Flexible Learning Spaces Designed Around Students

General learning areas are configured to support flexible, student-centred teaching.

Typical classrooms include:

  • A 7″ Crestron touch panel for intuitive room control
  • Multiple displays with NVX decoders
  • Touchdown points with NVX encoders supporting Vivi and laptop input
  • HDMI inputs at displays to enable student breakout collaboration

This configuration supports the shift away from lecture-style delivery, letting teachers move freely, present wirelessly and adapt content layouts to suit whole-class and group learning.

Rooms with inter-operable (operable) walls also have the capability to combine multiple GLAs into a single larger space for exams, presentations, or cohort-based activities. This room-combining functionality is fully managed through the Crestron user interface, allowing seamless control of displays, sources, and audio across the joined spaces.

Brisbane Grammar School - AV Integrated Solution by Videopro
Brisbane Grammar School STEAM Project - Audio Visual Solution by Videopro

Beyond the Classroom

The STEAM Building also includes advanced collaboration spaces for staff and the wider school community.

A Crestron Flex–controlled boardroom, featuring an Aver PTZ camera and Sennheiser ceiling microphone arrays, provides professional-grade hybrid meeting capability. Multiple Microsoft Teams Rooms equipped with Logitech Rally solutions support small-group collaboration and remote meetings.

At the heart of the building, a large atrium functions as a town hall and assembly space. Anchored by a 4.8 m × 2.7 m VuePix Wallpaper LED wall with 2.5 mm pixel pitch, the space delivers exceptional visual performance even in bright ambient light. Meyer Audio loudspeakers and Allen & Heath mixing provide high-quality sound reinforcement, with all systems centrally controlled via Crestron for simple, reliable operation.

Brisbane Grammar School - STEAM Building - A Videopro AV Installation

A Foundation for the Future

More than just a new facility, the Brisbane Grammar School STEAM Building is a tangible expression of the school’s future-focused teaching vision. By combining thoughtful spatial design with seamlessly integrated AV technology, Videopro has delivered a flexible, intuitive and scalable learning environment that will support innovation in education for years to come.

“It’s everything we hoped it would be and it was kind of like a stepping stone. It gives a peak into the future I think of teaching.” said Mitchell.

Videopro Proud

This is a project Videopro is particularly proud to have been part of. Seeing this project come to life has been incredible and we are so happy to hear that the teacher experience has been fantastic and very user-friendly.

“It’s been great working with Brisbane Grammar and seeing such a large scale project come to fruition and we look forward to working with them again in the future.” said Mark Chaplin, Videopro Account Manager.

Finalist in the 2024 AVIA Awards ‘Best Application of AV in Education’ category

This Brisbane Grammar STEAM Building project was recognised by the industry at the 2024 AVIA Awards where Videopro was named as a Finalist in the ‘Best Application of AV in Education’ category.

Let’s Chat

For more information or to speak to our expert team about an Audio Visual solution for your workplace or educational space, contact us on 1300 843 367 or via the website.